Ending productions from finished product production

Dawid Kaczmarek Updated by Dawid Kaczmarek

If less quantity than planned of the FP is 'Reported as finished' it is assumed that less quantity of the BP/CP will be consumed as well. The quantity for BP/CP is automatically corrected for the last BP production in the production mix pool, according to the decreased consumption.

When setup, the process of reporting the last FP production in a mix pool as finished and end-job mark is selected, the existing BP productions in the mix pool will be end-job marked automatically as well.

If end-mark picking list and/or end-mark route is marked, the existing BP productions in the mix pool will be end-job marked automatically as well.

NOTE: The 'Accept error' marking, will NOT be cascaded to all journals in the mix-pool when posting is done. Any errors need to be resolved for the production/batch order in question, before 'End job' can be done automatically.

This functionality is controlled by a parameter, setup in [Production control / Setup / CEPHEO Process Solution production parameter – Reporting as finished – Auto end job]

NOTE: It is not recommended to use the standard WHS parameters to control overproduction (surplus), and the PI parameters for overproduction at the same time. Only PI parameters will accept automatic end-marking.

Figure 30: Automatic ending at reporting as finished.