Produced items and primary packaging
Updated
by Peter Kure Bek-Thorngreen
Produced items and primary packaging
BOM setup, production journal calculation, and worked example
Purpose
This guide explains how to identify packaging components in a bill of materials and record proportional primary-package quantities when production is reported as finished.
Prerequisites
- Packaging components exist as released products and package definitions.
- Each package definition has a Material ID.
- A BOM and active BOM version exist for the produced item.
- Users can maintain BOM lines and production journals.
Configure the packaging product
- Open the released product representing the packaging, for example a carton.
- Locate the ESG Packaging section on the Sales tab.
- Set Primary package item to Yes.
- Select the Primary package material.
- Save the product.

Configure the BOM
Mark packaging BOM lines
- Open the applicable BOM.
- Add or select the packaging-item line.
- Confirm Primary package item is Yes.
- Save, approve, and activate the BOM according to the normal process.
Copied value: When a released product is already marked as a primary-package item, the setting is copied when the BOM line is initialized. Confirm it before activation. |

Enable calculation on the BOM version
- Open the BOM version in the BOM composition page.
- On the General tab, locate the ESG Packaging group.
- Set Calc primary package to Yes.
- Save the BOM version.
Current behavior: The setting is copied to the production order when initialized. Journal records are selected from production BOM lines marked Primary package item. Maintain both controls consistently; the BOM-line flag is decisive for generated records in the current version. |

Production journal process
- Create the production order from the configured BOM version.
- Verify the packaging lines on the production BOM.
- Create or open the report-as-finished production journal.
- Enter the good quantity.
- Review the Primary packaging area.
- Correct source master data if packaging is missing or inaccurate.
- Post the journal through the normal process.
Field | Meaning |
Production | Production order that used the package. |
Packaging ID | Package identified from the production BOM item. |
Quantity | Quantity calculated for the reported good quantity. |
Unit | Unit copied from the production BOM line. |

Worked example: cartons for produced cereal
Scenario: A production order is scheduled for 100 boxes of cereal. The BOM requires one carton per finished box. Only 40 good units are reported in the first journal.
Setup area | Example value |
Packaging product | CARTON-1 |
Primary package item | Yes |
Material | CARDBOARD |
Package definition material | 0.25 kg CARDBOARD per carton |
Scheduled production quantity | 100 ea |
Calculated BOM quantity | 100 cartons |
Reported good quantity | 40 ea |
Package quantity = calculated BOM quantity x reported good quantity / scheduled production quantity.
Expected result: 100 x 40 / 100 = 40 cartons in the production journal. The corresponding material basis is 10 kg of cardboard when the package definition contains 0.25 kg per carton. |
Operational guidance
- Correct packaging setup at the source rather than routinely editing calculated transaction records.
- Create journal lines after the correct BOM setup is in place.
- Test both full and partial report-as-finished quantities.
- Avoid double counting if the same package is registered through both production and shipping processes. Define clearly which records support each reporting purpose.
Troubleshooting
Issue | Check |
No packaging line | Primary package item on production BOM line, package definition, and Material ID. |
Unexpected quantity | Scheduled quantity, BOM quantity, reported good quantity, and line unit. |
Old setup used | Production order may have been created before the BOM-version setting changed. |
Material cannot be traced | Verify the packaging item maps to a package definition with a material. |